- Home
- Rogz Classic Range
- Rogz Classic Control Extra Large Long Dog Lead Red
Description
So, your dog really loves walks? We don’t blame them – walkies are pretty exciting. But if your dog’s always bounding and dashing all over the place, and your poor shoulder is at risk of falling off, we’ve got just the thing…Rogz Classic Control Leads are designed to make walkies even easier – for you, and for your excitable best friend. These feature-packed leads are made from nylon, with a flexible, bouncy section of stretchy neoprene which absorbs some of the shock when your dog decides it’s a great idea to jump forward to say hi to another dog.
For those moments when you need a little more control, like crossing the road, either grab the secondary handle that’s closer to where the lead attaches to your dog’s collar, or use the ShocLoc function – a nylon length that overrides the shock absorbing function completely. Clever!
- Made from tough nylon webbing, with stitching that reflects the light at night for added safety
- Neoprene padded handle is comfortable to hold, and the elasticised shock absorbing section below eases the strain on you and your dog when your dog leaps forward
- For even more control, the Classic Control Lead has a ShockLoc function – a length of lead that can be attached to cover the shock absorbing part of the lead so this lead acts as a regular lead
- A metal ring near the handle lets you attach a waste bag holder or other accessories
- Strong trigger hook makes it easy to attach this lead to your dog’s collar or harness
- Not what you’re after? Don’t worry – there’s so much more to choose from. Here’s a look at the rest of our Rogz collars, leads and harnesses
- Rogz also make dog beds, dog toys and even cat collars! Click here for the whole Rogz range!
Colour: Red
Size: Extra Large, available in two lengths
Length: 1.2m
Webbing width: 2.5cm
Description
So, your dog really loves walks? We don’t blame them – walkies are pretty exciting. But if your dog’s always bounding and dashing all over the place, and your poor shoulder is at risk of falling off, we’ve got just the thing…Rogz Classic Control Leads are designed to make walkies even easier – for you, and for your excitable best friend. These feature-packed leads are made from nylon, with a flexible, bouncy section of stretchy neoprene which absorbs some of the shock when your dog decides it’s a great idea to jump forward to say hi to another dog.
For those moments when you need a little more control, like crossing the road, either grab the secondary handle that’s closer to where the lead attaches to your dog’s collar, or use the ShocLoc function – a nylon length that overrides the shock absorbing function completely. Clever!
- Made from tough nylon webbing, with stitching that reflects the light at night for added safety
- Neoprene padded handle is comfortable to hold, and the elasticised shock absorbing section below eases the strain on you and your dog when your dog leaps forward
- For even more control, the Classic Control Lead has a ShockLoc function – a length of lead that can be attached to cover the shock absorbing part of the lead so this lead acts as a regular lead
- A metal ring near the handle lets you attach a waste bag holder or other accessories
- Strong trigger hook makes it easy to attach this lead to your dog’s collar or harness
- Not what you’re after? Don’t worry – there’s so much more to choose from. Here’s a look at the rest of our Rogz collars, leads and harnesses
- Rogz also make dog beds, dog toys and even cat collars! Click here for the whole Rogz range!
Colour: Red
Size: Extra Large, available in two lengths
Length: 1.2m
Webbing width: 2.5cm
Related Products
Rogz Classic Control Extra Large Long Dog Lead Blue

Rogz Classic Control Extra Large Long Dog Lead Blue
$37.49
So, your dog really loves walks? We don’t blame them – walkies are pretty exciting. But if your dog’s always bounding and dashing all over the place, and your poor shoulder is at risk of falling off, we’ve got just the thing… Rogz Classic Control Leads are designed to make walkies even easier – for you, and for your excitable best friend. These ...
Rogz Classic Control Medium Dog Lead Blue

Rogz Classic Control Medium Dog Lead Blue
$36.74
So, your dog really loves walks? We don’t blame them – walkies are pretty exciting. But if your dog’s always bounding and dashing all over the place, and your poor shoulder is at risk of falling off, we’ve got just the thing… Rogz Classic Control Leads are designed to make walkies even easier – for you, and for your excitable best friend. These ...
Rogz Classic Control Medium Dog Lead Pink

Rogz Classic Control Medium Dog Lead Pink
$36.74
So, your dog really loves walks? We don’t blame them – walkies are pretty exciting. But if your dog’s always bounding and dashing all over the place, and your poor shoulder is at risk of falling off, we’ve got just the thing… Rogz Classic Control Leads are designed to make walkies even easier – for you, and for your excitable best friend. These ...
Rogz Classic Control Medium Dog Lead Red

Rogz Classic Control Medium Dog Lead Red
$36.74
So, your dog really loves walks? We don’t blame them – walkies are pretty exciting. But if your dog’s always bounding and dashing all over the place, and your poor shoulder is at risk of falling off, we’ve got just the thing… Rogz Classic Control Leads are designed to make walkies even easier – for you, and for your excitable best friend. These ...
Rogz Classic Extra Large Dog Collar Black

Rogz Classic Extra Large Dog Collar Black
$20.24
Totally smart. Totally strong. And they’re totally good looking too. There are so many reasons why we totally love Rogz Classic Collars! These flexible nylon collars might look pretty straightforward, but they’re packed with clever features. Like the way they’re woven with reflective stitching to reflect the light at night, and a tough metal rin...
Rogz Classic Extra Large Dog Collar Blue

Rogz Classic Extra Large Dog Collar Blue
$20.24
Totally smart. Totally strong. And they’re totally good looking too. There are so many reasons why we totally love Rogz Classic Collars! These flexible nylon collars might look pretty straightforward, but they’re packed with clever features. Like the way they’re woven with reflective stitching to reflect the light at night, and a tough metal rin...
Rogz Classic Extra Large Dog Collar Pink

Rogz Classic Extra Large Dog Collar Pink
$20.24
Totally smart. Totally strong. And they’re totally good looking too. There are so many reasons why we totally love Rogz Classic Collars! These flexible nylon collars might look pretty straightforward, but they’re packed with clever features. Like the way they’re woven with reflective stitching to reflect the light at night, and a tough metal rin...
Rogz Classic Extra Large Dog Collar Purple

Rogz Classic Extra Large Dog Collar Purple
$20.24
Totally smart. Totally strong. And they’re totally good looking too. There are so many reasons why we totally love Rogz Classic Collars! These flexible nylon collars might look pretty straightforward, but they’re packed with clever features. Like the way they’re woven with reflective stitching to reflect the light at night, and a tough metal rin...
Rogz Classic Extra Large Dog Collar Red

Rogz Classic Extra Large Dog Collar Red
$20.24
Totally smart. Totally strong. And they’re totally good looking too. There are so many reasons why we totally love Rogz Classic Collars! These flexible nylon collars might look pretty straightforward, but they’re packed with clever features. Like the way they’re woven with reflective stitching to reflect the light at night, and a tough metal rin...
Rogz Classic Extra Large Dog Collar Turquoise

Rogz Classic Extra Large Dog Collar Turquoise
$20.24
Totally smart. Totally strong. And they’re totally good looking too. There are so many reasons why we totally love Rogz Classic Collars! These flexible nylon collars might look pretty straightforward, but they’re packed with clever features. Like the way they’re woven with reflective stitching to reflect the light at night, and a tough metal rin...
Rogz Classic Extra Large Dog Lead Black

Rogz Classic Extra Large Dog Lead Black
$21.74
Rogz Classic Leads – it's more than a name. These leads are considered classics for a reason! These leads might look pretty straightforward, but they’re actually packed with features. Like the way they’re made with reflective stitching, which makes night walkies even safer. There's also the strong die-cast metal attachment that’s really easy to ...
Rogz Classic Extra Large Dog Lead Blue

Rogz Classic Extra Large Dog Lead Blue
$21.74
Rogz Classic Leads – it's more than a name. These leads are considered classics for a reason! These leads might look pretty straightforward, but they’re actually packed with features. Like the way they’re made with reflective stitching, which makes night walkies even safer. There's also the strong die-cast metal attachment that’s really easy to ...
Free metro shipping over $49*
In-Store Grooming Studios
Zip and Afterpay Available
If you’re local (or not), use our 30 Minute Click and Collect service to place your order online for pickup from your local Habitat!
Find your local Habitat
In-Store Services
Support
About us