Need it ASAP? Order online and get Same Day Delivery from your local Habitat. T&Cs apply Click here for more info.

  • Free metro shipping over $49*
  • In-Store Grooming Studios
  • Zip and Afterpay Available
{"id":574637703198,"title":"Rogz Classic Control Extra Large Long Dog Lead Red","handle":"rogz-lumberjack-control-long-lead-red","description":"So, your dog \u003cem\u003ereally\u003c\/em\u003e loves walks? We don’t blame them – walkies are pretty exciting. But if your dog’s always bounding and dashing all over the place, and your poor shoulder is at risk of falling off, we’ve got just the thing…\u003cbr\u003e\u003cbr\u003e \u003cstrong\u003eRogz Classic Control Leads\u003c\/strong\u003e are designed to make walkies even easier – for you, and for your excitable best friend. These feature-packed leads are made from nylon, with a flexible, bouncy section of stretchy neoprene which absorbs some of the shock when your dog decides it’s a great idea to jump forward to say hi to another dog.\u003cbr\u003e\u003cbr\u003e For those moments when you need a little more control, like crossing the road, either grab the secondary handle that’s closer to where the lead attaches to your dog’s collar, or use the ShocLoc function – a nylon length that overrides the shock absorbing function completely. Clever! \u003cbr\u003e\u003cbr\u003e\n\u003cul\u003e\n\u003cli\u003eMade from tough nylon webbing, with stitching that reflects the light at night for added safety\u003c\/li\u003e\n\u003cli\u003eNeoprene padded handle is comfortable to hold, and the elasticised shock absorbing section below eases the strain on you and your dog when your dog leaps forward\u003c\/li\u003e\n\u003cli\u003eFor even more control, the Classic Control Lead has a ShockLoc function – a length of lead that can be attached to cover the shock absorbing part of the lead so this lead acts as a regular lead\u003c\/li\u003e\n\u003cli\u003eA metal ring near the handle lets you attach a waste bag holder or other accessories\u003c\/li\u003e\n\u003cli\u003eStrong trigger hook makes it easy to attach this lead to your dog’s collar or harness\u003c\/li\u003e\n\u003cli\u003eNot what you’re after? Don’t worry – there’s so much more to choose from. Here’s a look at the rest of our\u003cspan\u003e \u003c\/span\u003e\u003ca href=\"https:\/\/www.habitatpets.com.au\/collections\/rogz-leads-collars-and-harnesses\" title=\"Rogz Dog Collars Dog Leads Dog Harnesses\"\u003eRogz collars, leads and harnesses\u003c\/a\u003e\n\u003c\/li\u003e\n\u003cli\u003eRogz also make dog beds, dog toys and even cat collars!\u003cspan\u003e \u003c\/span\u003e\u003ca href=\"https:\/\/www.habitatpets.com.au\/collections\/rogz\" title=\"Rogz Dog toys dog beds dog collars dog leads cat collars cat harnesses\"\u003eClick here for the whole Rogz range\u003c\/a\u003e!\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cbr\u003e\u003cbr\u003e Colour: Red\u003cbr\u003e Size: Extra Large, available in two lengths\u003cbr\u003e Length: 1.2m\u003cbr\u003e Webbing width: 2.5cm","published_at":"2024-07-01T11:17:19","created_at":"2018-03-20T15:28:55","vendor":"ROGZ","type":"COLLAR LEADS HARNESS","tags":["Animal_Dog","Brand_Rogz","Breed Size_Giant","Collars Leads \u0026 Harnesses","Colour_Red","Dog","Lifestage_Adult","Material_Neoprene","Material_Nylon","Size_Extra Large","Variety_Lead","XO","XOP","XP"],"price":3749,"price_min":3749,"price_max":3749,"price_varies":false,"compare_at_price":4999,"compare_at_price_min":4999,"compare_at_price_max":4999,"compare_at_price_varies":false,"all_variant_ids":[7926767517726],"variants":[{"id":7926767517726,"product_id":574637703198,"product_handle":"rogz-lumberjack-control-long-lead-red","title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"649510037726","requires_shipping":true,"taxable":true,"featured_image":null,"image_id":null,"available":true,"name":"Rogz Classic Control Extra Large Long Dog Lead Red - Default Title","options":["Default Title"],"price":3749,"weight":100,"compare_at_price":4999,"inventory_quantity":40,"inventory_management":"shopify","inventory_policy":"deny","inventory_in_cart":0,"inventory_remaining":40,"incoming":false,"next_incoming_date":null,"taxable":true,"barcode":"0"}],"available":true,"images":["\/\/www.habitatpets.com.au\/cdn\/shop\/products\/Rogz-Classic-Control-Extra-Large-Long-Dog-Lead-Red.jpg?v=1743643655","\/\/www.habitatpets.com.au\/cdn\/shop\/products\/Rogz-Classic-Control-Extra-Large-Long-Dog-Lead-Red-2.jpg?v=1756742581"],"featured_image":"\/\/www.habitatpets.com.au\/cdn\/shop\/products\/Rogz-Classic-Control-Extra-Large-Long-Dog-Lead-Red.jpg?v=1743643655","options":["Title"],"url":"\/products\/rogz-lumberjack-control-long-lead-red"}
Sale
Sku: 649510037726

Rogz Classic Control Extra Large Long Dog Lead Red

Description

So, your dog really loves walks? We don’t blame them – walkies are pretty exciting. But if your dog’s always bounding and dashing all over the place, and your poor shoulder is at risk of falling off, we’ve got just the thing…

Rogz Classic Control Leads are designed to make walkies even easier – for you, and for your excitable best friend. These feature-packed leads are made from nylon, with a flexible, bouncy section of stretchy neoprene which absorbs some of the shock when your dog decides it’s a great idea to jump forward to say hi to another dog.

For those moments when you need a little more control, like crossing the road, either grab the secondary handle that’s closer to where the lead attaches to your dog’s collar, or use the ShocLoc function – a nylon length that overrides the shock absorbing function completely. Clever!

  • Made from tough nylon webbing, with stitching that reflects the light at night for added safety
  • Neoprene padded handle is comfortable to hold, and the elasticised shock absorbing section below eases the strain on you and your dog when your dog leaps forward
  • For even more control, the Classic Control Lead has a ShockLoc function – a length of lead that can be attached to cover the shock absorbing part of the lead so this lead acts as a regular lead
  • A metal ring near the handle lets you attach a waste bag holder or other accessories
  • Strong trigger hook makes it easy to attach this lead to your dog’s collar or harness
  • Not what you’re after? Don’t worry – there’s so much more to choose from. Here’s a look at the rest of our Rogz collars, leads and harnesses
  • Rogz also make dog beds, dog toys and even cat collars! Click here for the whole Rogz range!


Colour: Red
Size: Extra Large, available in two lengths
Length: 1.2m
Webbing width: 2.5cm
Sale
Sku: 649510037726

Rogz Classic Control Extra Large Long Dog Lead Red

$49.99

$37.49

Maximum quantity available reached.

Buy now Pay Later Available

Description

So, your dog really loves walks? We don’t blame them – walkies are pretty exciting. But if your dog’s always bounding and dashing all over the place, and your poor shoulder is at risk of falling off, we’ve got just the thing…

Rogz Classic Control Leads are designed to make walkies even easier – for you, and for your excitable best friend. These feature-packed leads are made from nylon, with a flexible, bouncy section of stretchy neoprene which absorbs some of the shock when your dog decides it’s a great idea to jump forward to say hi to another dog.

For those moments when you need a little more control, like crossing the road, either grab the secondary handle that’s closer to where the lead attaches to your dog’s collar, or use the ShocLoc function – a nylon length that overrides the shock absorbing function completely. Clever!

  • Made from tough nylon webbing, with stitching that reflects the light at night for added safety
  • Neoprene padded handle is comfortable to hold, and the elasticised shock absorbing section below eases the strain on you and your dog when your dog leaps forward
  • For even more control, the Classic Control Lead has a ShockLoc function – a length of lead that can be attached to cover the shock absorbing part of the lead so this lead acts as a regular lead
  • A metal ring near the handle lets you attach a waste bag holder or other accessories
  • Strong trigger hook makes it easy to attach this lead to your dog’s collar or harness
  • Not what you’re after? Don’t worry – there’s so much more to choose from. Here’s a look at the rest of our Rogz collars, leads and harnesses
  • Rogz also make dog beds, dog toys and even cat collars! Click here for the whole Rogz range!


Colour: Red
Size: Extra Large, available in two lengths
Length: 1.2m
Webbing width: 2.5cm

Related Products

Click & Collect - Same Day Delivery

Certain products can only be purchased via our Click & Collect or Same Day Delivery services.

  • If you’re local (or not), use our 30 Minute Click and Collect service to place your order online for pickup from your local Habitat!
  • If you’re a local and live within 10kms from a Habitat store, use our Same Day Delivery service to place your order online for delivery from your local Habitat for only $10!
  • Full terms and conditions available on our website
Item has been added to your cart