- Home
- Rogz Dog Collars, Leads and Harnesses
- Rogz Classic Control Extra Large Long Dog Lead Black
Rogz Classic Control Extra Large Long Dog Lead Black
Description
So, your dog really loves walks? We don’t blame them – walkies are pretty exciting. But if your dog’s always bounding and dashing all over the place, and your poor shoulder is at risk of falling off, we’ve got just the thing…Rogz Classic Control Leads are designed to make walkies even easier – for you, and for your excitable best friend. These feature-packed leads are made from nylon, with a flexible, bouncy section of stretchy neoprene which absorbs some of the shock when your dog decides it’s a great idea to jump forward to say hi to another dog.
For those moments when you need a little more control, like crossing the road, either grab the secondary handle that’s closer to where the lead attaches to your dog’s collar, or use the ShocLoc function – a nylon length that overrides the shock absorbing function completely. Clever!
- Made from tough nylon webbing, with stitching that reflects the light at night for added safety
- Neoprene padded handle is comfortable to hold, and the elasticised shock absorbing section below eases the strain on you and your dog when your dog leaps forward
- For even more control, the Classic Control Lead has a ShockLoc function – a length of lead that can be attached to cover the shock absorbing part of the lead so this lead acts as a regular lead
- A metal ring near the handle lets you attach a waste bag holder or other accessories
- Strong trigger hook makes it easy to attach this lead to your dog’s collar or harness
- Not what you’re after? Don’t worry – there’s so much more to choose from. Here’s a look at the rest of our Rogz collars, leads and harnesses
- Rogz also make dog beds, dog toys and even cat collars! Click here for the whole Rogz range!
Colour: Black
Size: Extra Large, available in two lengths
Length: 1.2m
Webbing width: 2.5cm
Description
So, your dog really loves walks? We don’t blame them – walkies are pretty exciting. But if your dog’s always bounding and dashing all over the place, and your poor shoulder is at risk of falling off, we’ve got just the thing…Rogz Classic Control Leads are designed to make walkies even easier – for you, and for your excitable best friend. These feature-packed leads are made from nylon, with a flexible, bouncy section of stretchy neoprene which absorbs some of the shock when your dog decides it’s a great idea to jump forward to say hi to another dog.
For those moments when you need a little more control, like crossing the road, either grab the secondary handle that’s closer to where the lead attaches to your dog’s collar, or use the ShocLoc function – a nylon length that overrides the shock absorbing function completely. Clever!
- Made from tough nylon webbing, with stitching that reflects the light at night for added safety
- Neoprene padded handle is comfortable to hold, and the elasticised shock absorbing section below eases the strain on you and your dog when your dog leaps forward
- For even more control, the Classic Control Lead has a ShockLoc function – a length of lead that can be attached to cover the shock absorbing part of the lead so this lead acts as a regular lead
- A metal ring near the handle lets you attach a waste bag holder or other accessories
- Strong trigger hook makes it easy to attach this lead to your dog’s collar or harness
- Not what you’re after? Don’t worry – there’s so much more to choose from. Here’s a look at the rest of our Rogz collars, leads and harnesses
- Rogz also make dog beds, dog toys and even cat collars! Click here for the whole Rogz range!
Colour: Black
Size: Extra Large, available in two lengths
Length: 1.2m
Webbing width: 2.5cm
Related Products

Rogz Classic Amphibian Black Dog Collar Extra Large
$22.99
Recommended for everyday use and identification, Rogz Amphibian Classic Collars are ultra-durable and hard wearing. The non-absorbent PVC coated webbing does not allow water to penetrate, making this collar instant-dry, odour resistant and easy to clean. This collar is ideal for water bound activity. Size: Extra Large 43-70cm x 25mm Colour: Black

Rogz Classic Amphibian Black Dog Collar Large
$19.99
Recommended for everyday use and identification, Rogz Amphibian Classic Collars are ultra-durable and hard wearing. The non-absorbent PVC coated webbing does not allow water to penetrate, making this collar instant-dry, odour resistant and easy to clean. This collar is ideal for water bound activity. Size: Large 34-56cm x 20mm Colour: Black

Rogz Classic Amphibian Black Dog Collar Medium
$16.99
Recommended for everyday use and identification, Rogz Amphibian Classic Collars are ultra-durable and hard wearing. The non-absorbent PVC coated webbing does not allow water to penetrate, making this collar instant-dry, odour resistant and easy to clean. This collar is ideal for water bound activity. Size: Medium 26-40cm x 16mm Colour: Black

Rogz Classic Amphibian Black Dog Lead Extra Large
$27.99
Recommended for everyday use, Rogz Amphibian Classic Leads are ultra-durable with extra texture grip for wet conditions. The PVC coated webbing is easy to clean, odour resistant and dries instantly, making it ideal for water bound activity and exposure to dust and dirt. Size: Extra Large, 1.2m x 25mm Colour: Black

Rogz Classic Amphibian Black Dog Lead Large
$24.99
Recommended for everyday use, Rogz Amphibian Classic Leads are ultra-durable with extra texture grip for wet conditions. The PVC coated webbing is easy to clean, odour resistant and dries instantly, making it ideal for water bound activity and exposure to dust and dirt. Size: Large, 1.4m x 20mm Colour: Black

Rogz Classic Amphibian Black Dog Lead Medium
$20.99
Recommended for everyday use, Rogz Amphibian Classic Leads are ultra-durable with extra texture grip for wet conditions. The PVC coated webbing is easy to clean, odour resistant and dries instantly, making it ideal for water bound activity and exposure to dust and dirt. Size: Medium, 1.8m x 16mm Colour: Black

Rogz Classic Amphibian Blue Dog Collar Extra Large
$22.99
Recommended for everyday use and identification, Rogz Amphibian Classic Collars are ultra-durable and hard wearing. The non-absorbent PVC coated webbing does not allow water to penetrate, making this collar instant-dry, odour resistant and easy to clean. This collar is ideal for water bound activity. Size: Extra Large 43-70cm x 25mm Colour: Blue

Rogz Classic Amphibian Blue Dog Collar Large
$19.99
Recommended for everyday use and identification, Rogz Amphibian Classic Collars are ultra-durable and hard wearing. The non-absorbent PVC coated webbing does not allow water to penetrate, making this collar instant-dry, odour resistant and easy to clean. This collar is ideal for water bound activity. Size: Large 34-56cm x 20mm Colour: Blue

Rogz Classic Amphibian Blue Dog Collar Medium
$16.99
Recommended for everyday use and identification, Rogz Amphibian Classic Collars are ultra-durable and hard wearing. The non-absorbent PVC coated webbing does not allow water to penetrate, making this collar instant-dry, odour resistant and easy to clean. This collar is ideal for water bound activity. Size: Medium 26-40cm x 16mm Colour: Medium

Rogz Classic Amphibian Blue Dog Lead Extra Large
$27.99
Recommended for everyday use, Rogz Amphibian Classic Leads are ultra-durable with extra texture grip for wet conditions. The PVC coated webbing is easy to clean, odour resistant and dries instantly, making it ideal for water bound activity and exposure to dust and dirt. Size: Extra Large, 1.2m x 25mm Colour: Blue

Rogz Classic Amphibian Blue Dog Lead Large
$24.99
Recommended for everyday use, Rogz Amphibian Classic Leads are ultra-durable with extra texture grip for wet conditions. The PVC coated webbing is easy to clean, odour resistant and dries instantly, making it ideal for water bound activity and exposure to dust and dirt. Size: Large, 1.4m x 20mm Colour: Blue

Rogz Classic Amphibian Blue Dog Lead Medium
$20.99
Recommended for everyday use, Rogz Amphibian Classic Leads are ultra-durable with extra texture grip for wet conditions. The PVC coated webbing is easy to clean, odour resistant and dries instantly, making it ideal for water bound activity and exposure to dust and dirt. Size: Medium, 1.8m x 16mm Colour: Blue
Free metro shipping over $49*
In-Store Grooming Studios
Zip and Afterpay Available
If you’re local (or not), use our 30 Minute Click and Collect service to place your order online for pickup from your local Habitat!
Find your local Habitat
In-Store Services
Support
About us